School

The school is made without one even wall. Without a bim of design, the implementation of the object was very complex and with many bugs. The ventilation systems were redesigned 4 times, the structural scheme - twice, after calculating the cost, which allowed the client to save 30 percent of the cost of such a complex building.

The total area of the school: 2200 sq.